CITY OF NORTH RIDGEVILLE, LORAIN COUNTY, OHIO

 

ELIMINATION OF THE SCHNEIDER

PUMP STATION

SANITARY SEWER IMPROVEMENTS

ENGINEER'S ESTIMATE OF PROBABLE COST

$166,000.00

OPENING BIDS: JUNE 6, 2008

ANTICAPTED START DATE: JUNE 15, 2008

PLANS AVAILABLE MAY 22ND

PLANS PURCHASED AT CITY OF

NORTH RIDGEVILLE FOR $ 65.00

7307 AVON BELDON RD.

PROJECT MANAGER

              LDC, INC., d.b.a. LAND DESIGN CONSULTANTS

                                   9025 OSBORNE DRIVE

                                   MENTOR, OHIO 44060

                                   (440) 255-8463 PHONE

                                   (440) 255-9575 FAX

           CONTACT:  THOMAS BEUTLER, P.E.  TomB@LDCinc.net

This project as awarded to Fabrizi Excavating

ONLINE BID DOCUMENTS

BID SUMMARY

BIDDERS LIST 6/02

LEGAL NOTICE

ADDENDUM

ADDENDUM 2 (6/2)

BID BOOK

PLAN SET

BID PROPOSAL SHEETS

 

CONCORD TOWNSHIP, LAKE COUNTY, OHIO

VIEWMOUNT DRIVE IMPROVEMENT - OPWC

REVISED BY ADDENDUM 5/12/08 ENGINEER'S ESTIMATE OF PROBALE CONSTRUCTION COST

$1,000,100.00

OPENING BIDS:  MAY  15, 2008, at   11 :00 AM

ANTICIPATED AWARD DATE:  May 21, 2008

ANTICIPATED START DATE: June 1, 2008

 

            ENGINEER LDC, INC., d.b.a. LAND DESIGN CONSULTANTS

                                   9025 OSBORNE DRIVE

                                   MENTOR, OHIO 44060

                                   (440) 255-8463 PHONE

                                   (440) 255-9575 FAX

           CONTACT:  THOMAS BEUTLER, P.E.  TomB@LDCinc.net

                                 WILLIAM VONDRA, P.E., P.S.   BillV@LDCinc.net

This project was awarded to Hallmark Excavating

ONLINE BID DOCUMENTS

BID RESULTS

BID RESULTS - SIDE BY SIDE

BID RESULTS - LINE BY LINE

ADDENDUM

BID BOOK

PLANS (pdf)

STABILIZATION MIX DESIGN

SUBSURFACE REPORT with Color Photos

     

VILLAGE OF NORTH PERRY, LAKE COUNTY, OHIO

TOWNLINE PARK WATERFRONT IMPROVEMENTS

ENGINEER'S ESTIMATE OF PROBABLE CONSTRUCTION COST $4,000.000.00

THIS IS A PREVAILING WAGE PROJECT

NORTH PERRY INCOME TAX RATE = 1.00%

OPENING BIDS:  APRIL 30, 2008 at  11:00 am

ANTICIPATED START DATE:  JULY 1, 2008

 

 

ENGINEERJJR 

                      ANN ARBOR, MICHIGAN

                      (734) 662-4457 PHONE

                      (734) 662-0779 FAX

OWNER:       VILLAGE OF NORTH PERRY

COASTAL CONSULTANT:  

                     HCCL

                     KINGSTON, ONTARIO, CANADA

VILLAGE ENGINEER / SURVEYOR:  

                     LDC, Inc., d.b.a.

                     LAND DESIGN CONSULTANTS, MENTOR, OHIO

GEOTECHNICAL CONSULTANTS:  

                    EDP CONSULTANTS, KIRTLAND, OHIO

ONLINE BID DOCUMENTS

SIDE BY SIDE COMPARISON OF BIDS

PRELIMINARY BID RESULTS

ADDENDUM

ADDITIONAL INFORMATION

INSTRUCTION TO BIDDERS

BID BOOK PART 1

BID BOOK PART 2

BID BOOK PART 3

GEOTECHNICAL PLANS

GEOTECHNICAL REPORT

CONSTRUCTION DRAWINGS - PDF

 

     
Upcoming Projects
OWNER
PROJECT
LOCATION
Lake County Department of Utilities
12" Watermain Upgrade - Hubbard Road Phase 2 (Chapel to Swetland)
Madison, Ohio
Lake County Department of Utilities
12" Watermain Upgrade - S.R. 84  (Kirtland Rd to west side of Chagrin River)
Willoughby, Ohio
Madison Township Trustees
Oldsmar Drive (not funded until after July 1, 2008) Storm Sewer Installation- OPWC
Madison, Ohio